Request a Roof Assessment

Fill out the form below or call (616) 947-7652 to schedule a commercial flat roof inspection for your West Michigan property.

Send Us a Message

By submitting this form you agree to be contacted by Flat Roof Waterproofing Solutions about your inquiry by phone or email. We do not sell your information. See our Privacy Policy and Terms of Service.

Have roof plans, a prior inspection report, or photos? Email them to [email protected] and we will review before we come out.

Contact Details

Address

601 S Beacon Blvd, Grand Haven, MI 49417

Serving West Michigan and the Midwest

Service Area

Grand Haven, MIMuskegon, MIHolland, MISpring Lake, MIFerrysburg, MINorton Shores, MIFruitport, MIZeeland, MIGrand Rapids, MIAllendale, MI

Select projects across the Midwest.

Active Roof Leak?

Call (616) 947-7652 if you have an active leak. We prioritize active water intrusion on West Michigan commercial properties: stop the water first, mitigate interior damage, then provide a written scope for the permanent repair.

Frequently Asked Questions

What do I need to have ready for the inspection?

Roof access and any access requirements for your facility. If you have them, roof plans, prior inspection or repair records, warranty documents for the existing roof, and the locations of known leaks. None of these are required; they shorten the visit and improve the report.

How quickly can you schedule an inspection?

Send your request by phone or email and we will respond with available dates. Active leaks over occupied or production space are prioritized. We do not promise a response time we cannot keep.

Do you provide written estimates?

Yes. Every inspection produces a written report with photographs, a prioritized findings list, the recommended scope, and cost ranges. Project pricing is stated in a written scope before any commitment.

Will I need to shut down the building?

In most cases, no. Repair, coating, and restoration work happens on the roof surface without tear-off. We coordinate rooftop equipment, air intakes, staging, and access with your facility team. Replacement projects are scheduled in sections to limit disruption.